- Time
- You will be informed about your application within 30 days at the latest (Law No. 3071, Art. 7).
- Fee
- Free of charge
Who can apply
Anyone.
Required documents
- Written request (dilekçe) or request by telephone (description of the location; a photograph if you have one)
How it works
- Send your request to the Public Works Directorate in writing, by telephone or through your neighbourhood head (muhtar).
- The request is examined on site and included in the work schedule.
Good to know
- For branches touching power lines, call the electricity distribution company: 186.
Legal basis
- 5216 sayılı Büyükşehir Belediyesi Kanunu md. 7
- 5393 sayılı Belediye Kanunu md. 14
- 3071 sayılı Kanun md. 7