- Time
- You will be informed about your application within 30 days at the latest (Law No. 3071, Art. 7).
- Fee
- The surface damage charge is calculated according to AYKOME’s unit prices for 2026.
Who can apply
Institutions, contractors and building owners who will dig up a road, a pavement or a green space for an infrastructure connection or repair.
Required documents
- Written request (dilekçe) stating the location, length, width and duration of the excavation
- A sketch showing the route of the excavation
How it works
- Find out who is responsible for the road to be excavated: for main roads and Metropolitan Municipality roads, the permit is obtained from Muğla Metropolitan Municipality’s AYKOME.
- For roads for which our Municipality is responsible, apply to the Public Works Directorate.
- The permit is issued once the surface damage charge (zemin tahrip bedeli) has been paid.
Legal basis
- 5216 sayılı Büyükşehir Belediyesi Kanunu md. 8
- Büyükşehir Belediyeleri Koordinasyon Merkezleri Yönetmeliği
- Ula Belediye Meclisinin 16.10.2025 tarihli ve 60 sayılı kararı (2026 Ücret Tarifesi)